Rush builds

In a bind on a date? We have built finished units in about 80 days.

Most HLE units deliver 3 to 6 months after the signed order. When a program can't wait (a grant deadline, a contract start date, a unit that went out of service), HLE has taken fully finished specialty vehicles from purchase order to completion in about 80 days. Twice.

Tabatha or one of the team will reach out shortly and tell you on that first call whether your date can be met.

~80 days

Purchase order to finished unit: two mobile probation and parole offices for the Virginia Department of Corrections.

~80 days

Purchase orders to sale: three 53-ft mobile lab trailers for a state technical college system, quoted at 90 to 120 days.

5 units

Fully finished, with the interior, generator and equipment installed. Not bare shells.

Virginia Department of Corrections

Two mobile offices, order to completion in about 80 days

Ford F-550 mobile probation and parole offices with a full interior: Altro flooring, FRP walls, oak cabinetry, granite tops, a 7 kW gas generator and a six-camera system. The order was signed August 13, 2025, and both units were complete on October 31, 2025, inside the contract's 100-day window.

Mobile office on a Ford F-550, front three-quarter, in the HLE plant
Mobile office for the Virginia Department of Corrections. Ford F-550.
Mobile office, driver side, entry door open
Driver side, entry door open.
Mobile office interior: desk and two chairs
Interview room: desk and two chairs.
Mobile office interior with wheelchair lift
Wheelchair lift at the rear.

A state technical college system

Three 53-ft lab trailers in about 80 days, against a 90 to 120 day quote

Triple-axle gooseneck mobile lab trailers with 38 kW diesel generators, wheelchair-lift doors and Bard HVAC, built for a state's technical colleges. The purchase orders were dated April 2, 2024; all three were sold June 20 and 21, 2024 and accepted by the colleges on June 24.

White gooseneck lab trailer outside, front three-quarter
Mobile lab trailer for a state technical college system. Triple-axle gooseneck, 53 ft.
Gooseneck lab trailer, side, with entry steps
Side, entry steps.
Gooseneck lab trailer, rear three-quarter
Rear three-quarter.
Lab trailer interior: work benches the full length
Work benches the full length.

Why it can be done

One plant builds the whole body.

The laser and press brake, steel cage, harness shop and rain booth are all under one roof in Wakarusa, Indiana (powder coat goes to a dedicated powder-coating shop), and HLE engineering draws the floor plan in house. A rush order is not waiting in line at an outside shop.

How an HLE body goes together, station by station →

What decides your date

  • The chassis: in stock, or on order
  • Long-lead equipment: medical, imaging, generators, lifts
  • How fast the floor plan and options are approved

The dated schedule for your unit is in the proposal. Standard timelines are on the delivery timeline.

Request a proposal

Tell us the date it has to be in service.

Describe the program and the deadline. Tabatha or one of the team will reach out shortly and tell you plainly whether the date can be met.

Request a rush build

Or call 574-343-2150, 7:30 to 4:30 Eastern, and ask for Tabatha.