Buying & funding › Funding & grants › Grant readiness guide
Grant readiness guide
Before you apply: the vehicle line, checked
A checklist for the program director or grant writer whose program will run from a vehicle or trailer: a clinic that travels, a transport van, a bookmobile. Work through it before the narrative is written; every item is something a reviewer or a purchasing office will ask later.
On this page
1. Eligibility: is the applicant eligible, and does the round allow a vehicle?
Two questions, answered in the solicitation itself, not the listing.
- The applicant. Each program names who can apply. USDA Community Facilities: public bodies, nonprofits and tribes in rural areas of up to 20,000 people. Alaska's RHTP Year 2 round: providers, tribes, hospitals, clinics, EMS, local governments and nonprofits, up to 5 applications each.
- The vehicle. Of about 15 federal programs on Grants.gov that could plausibly pay for a specialty vehicle on Oct 7, 2026, only 3 named vehicles or equipment as an allowed cost in the listing. "Check the NOFO" means the full funding notice decides, not the listing.
- The state's rules. State rounds set their own limits. Kentucky's RHTP mobile dental round excluded CDL-class vehicles; Texas's equipment awards excluded vehicles entirely.
- Who buys. Several large awards (JAG, CDC cancer screening) pass through the state; the vehicle buyer is a county or clinic further down the chain. Know which one you are.
2. The vehicle line: what the unit does that a building cannot
Reviewers read the vehicle line against the program, not against a catalog.
- Say what the unit does that a building cannot. Alaska asks for exactly that. Name the sites, the days, the people served at each stop.
- Expect a case-by-case review. CMS reviews RHTP vehicle purchases case by case. Most HHS programs restrict vehicle purchases or require prior approval.
- Check the capital cap. Alaska caps RHTP capital costs at 20% of the state's award; assume a similar ceiling elsewhere until your state says otherwise. A vehicle that takes the whole capital share leaves nothing for the rest of the plan.
- Attach the documents the line stands on: the floor plan sheet, the spec paragraphs and the budget range. The proposal kits hold all three.
3. Budget: a range, itemized, with delivery
The number in the application becomes the number purchasing has to buy against.
- A range, not a quote, until the project is qualified. HLE gives budget ranges for a plan on each platform (van, cutaway, medium-duty, trailer), never firm quotes before qualification. Ask how long the range holds: grant decisions often take months.
- Itemize the equipment. Separate what HLE supplies from what you furnish: the MRI, the dental chairs, the security package. If the budget carries only the vehicle, nothing pays for what goes inside.
- Put delivery on its own line. The unit is built in Wakarusa, Indiana. Getting it to you is a cost; budget it.
- Stack sources where the program allows it. RHTP or an HRSA grant often covers the program; USDA Community Facilities (grants of 15 to 75% of cost, plus low-rate loans) or opioid settlement money can cover the vehicle.
4. Procurement after award: how the vehicle gets bought
Winning the grant is not buying the vehicle. Purchasing still has to follow its rules.
- Federal dollars, federal purchasing rules. Subgrantees spending RHTP money follow them: quotes under $350K, a formal bid above.
- Spec around a published plan. A unit specified around a published floor plan, with a budget range already in the application, is in the strongest position. Whoever supplies the floor plan, spec and budget writes the spec the vehicle is later bid against.
- Compliance on paper. Every HLE body is FMVSS compliant, and built to ADA (49 CFR Part 38), FTA Altoona (49 CFR Part 665) and agency specifications when a purchase requires them, with documentation supplied for the bid file.
- The vendor packet. W-9, Buy America certificate, FTA TVM eligibility (FTA list), Indiana certificates, capability statement and references, with a current certificate of insurance on request; registration IDs (SAM UEI, CAGE) and the DBE statement are on the site. What is in it.
5. Timeline: work back from the date the money has to be spent
Award date, then procurement, then the build, then delivery. All of it has to fit inside the grant's spending window.
- Lead time. 3 to 6 months after the signed order, deposit and chassis; 3 to 4 months after the signed order, deposit and trailer for a trailer.
- The grant clock. RHTP money for each year has to be committed by the end of October and spent within the following year. Alaska's Year 2 awards are expected Nov–Dec, with a Jan 1, 2027 start.
- Deadlines. The tracker lists each round's deadline; the calendar and RSS feeds carry new rounds and closing dates for your states and what you need to fund.
- Decide early the plan, the platform and who furnishes the equipment. Those three set the budget range and the build time.
6. Permits and parking: where it sleeps, where it sets up
A unit that has nowhere to park, plug in or set up is a line in the budget that never runs. Answer these before the application names the stops.
- Where it parks at night. Ask sales for the dimensioned sheet for the plan you picked (the public plan sheets carry no dimensions) and measure the space against it: length, height under any roof or gate, the turn into the lot, and a surface that holds the weight. Name the address in the application.
- Shore power at the base. The unit runs its HVAC and equipment from building power when parked. Ask HLE what service the plan's shore power inlet takes, and get an electrician to price the outlet; it is a one-time cost.
- Each stop. Level ground, room to open the door and any wheelchair lift, a restroom the staff and visitors can use, and whether the unit runs on its generator or a building outlet there.
- Local permits. Some cities and counties require a permit to operate a mobile unit on a street or in a lot, and some limit generator noise at night. Ask the city or county before you list the stops.
- Health licensing. Ask your state health department whether a mobile clinic or dental unit needs its own license or registration as a site, and how long that takes. Put the answer in the timeline.
7. CDL and DOT: what the weight rating decides
The chassis's gross vehicle weight rating (GVWR) decides who can drive the unit. Pick the plan knowing who your drivers are.
- Class B CDL for a single vehicle with a GVWR of 26,001 pounds or more (49 CFR 383.91). Under that, a regular license drives it in most states.
- Class A CDL for a truck and trailer whose combined rating is 26,001 pounds or more when the trailer is rated over 10,000 pounds.
- Passenger endorsement for a vehicle designed to carry 16 or more people, driver included. That can apply to a transport bus.
- Grants that rule out CDL units. Kentucky's RHTP mobile dental round would not pay for a vehicle that needs a CDL. Read the notice for a weight or license limit before you pick the chassis.
- DOT rules. A unit over 10,000 pounds GVWR that crosses state lines in commerce falls under FMCSA rules (USDOT number, driver medical card, inspections). Units run by a state, county or city agency are exempt from most of those rules (49 CFR 390.3); a nonprofit follows its state's rules. Ask your state DOT which apply.
- Ask HLE for the GVWR of the chassis under the plan you picked. A smaller chassis or a trailer can keep a program inside a regular license.
8. Insurance: price it before the budget is final
The premium is a yearly operating cost, and some grants and lenders ask for proof of coverage before delivery.
- Auto liability on the chassis, like any fleet vehicle.
- Physical damage on the whole unit. Insure the value of the body and the built-in equipment, not just the chassis.
- Equipment you furnish. The MRI, the dental chairs, the laptops: check whether the auto policy covers them or they need their own coverage.
- Professional liability for the services. Ask whether your malpractice or professional policy covers care given from the unit at each stop.
- General liability at stops, for visitors on the steps, the lift and the lot.
- Get the quote early. Give your agent the plan sheet and the chassis; put the premium in the worksheet below.
9. Staffing: who drives, who sets up, who works inside
A unit needs a driver and a crew on top of the people who deliver the program. Count them before the narrative promises stops.
- The driver. A dedicated driver, or program staff who drive. If the chassis needs a CDL, so does the driver, and you need a backup.
- Setup and teardown. Leveling, power, awning, lift and signs take time at every stop. Count it in the hours of each visit.
- Staff per station. Match the plan's exam rooms, chairs or work stations to the people you will have. A two-room unit with one provider runs as a one-room unit.
- Daily checks and upkeep. Name who checks the generator, tanks, supplies and cleaning each day, and who books service.
10. First-year operating cost: a worksheet
Reviewers ask how the unit keeps running after the grant buys it. Fill in each line with your own numbers and quotes; the total is what your budget carries every year. The middle columns give you a starting point: what published programs and public budgets report, and the maintenance the HLE warranty asks for.
The figures are published third-party references, linked and dated, not HLE quotes; your program's number will differ with staffing, days on the road and the chassis. Rows marked "Ask HLE" need the plan and the generator you picked, and we answer them with the kit. HLE will help build the operating budget on request: write to [email protected].
| Line item | Published figure or reference | Basis / source | Your estimate |
|---|---|---|---|
| Fuel, drivingMiles a year ÷ miles per gallon × price per gallon | U.S. average, week of Oct 12, 2026: on-highway diesel $6.179 a gallon, regular gasoline $4.331 (taxes included). Miles per gallon by chassis: Ask HLE. | Weekly U.S. average retail price; use the current week when you fill this in (U.S. Energy Information Administration, weekly retail fuel prices, week of Oct 12, 2026; checked Oct 15, 2026) | $ |
| Fuel, generatorGenerator hours a year × gallons per hour × price per gallon | Gallons per hour by generator size: Ask HLE. Price per gallon as above. | No published third-party figure fits every generator; HLE gives the burn rate for the generator on the plan you picked. | $ |
| DriverDriving and setup hours a year × hourly cost with benefits | Labor is the largest line in every published study: 65% to 92% of annual operating cost by service type (dental 82%, primary care/preventive 92%, mammography/primary care/preventive 65%). A county bookmobile budgeted $84,000 a year for two full-time staff. | Labor share of cost, 15 programs in TX, NC, GA and FL (Attipoe-Dorcoo et al., "Analysis of Annual Costs of Mobile Clinics in the Southern United States," J. Primary Care & Community Health, 2020, 2018 dollars; checked Oct 15, 2026); bookmobile personnel line (Augusta-Richmond County (GA) Public Library, SPLOST 8 bookmobile project request, budget years 2022–2027; checked Oct 15, 2026) | $ |
| Chassis maintenanceService at the chassis maker's intervals, tires, brakes | Maintenance ran 3% to 10% of annual operating cost in the same study (primary care/preventive 3%, preventive 4%, dental 7%, mammography/primary care/preventive 10%). Typical annual spend by chassis: Ask HLE. | Maintenance share of cost (Attipoe-Dorcoo et al., "Analysis of Annual Costs of Mobile Clinics in the Southern United States," J. Primary Care & Community Health, 2020, 2018 dollars; checked Oct 15, 2026); a bookmobile's repairs ran $3,703 to $10,831 a year over six years (City of Newport News (VA) Libraries, FY2012 budget position paper on bookmobile service, April 2011; checked Oct 15, 2026) | $ |
| Body and systems maintenanceGenerator service by hours, HVAC, lift, plumbing, cleaning | The written warranty sets two intervals: the roof is inspected and resealed at least every 12 months on vans and conversions and at least every 6 months on HLE-built bodies; plumbing is winterized before freezing weather. Generator service hours and the cost of a service visit: Ask HLE. | HLE's own terms: vans and conversions warranty, rev. June 2026; structural body warranty, rev. July 2025. A county bookmobile budgeted $10,000 a year for equipment maintenance (Augusta-Richmond County (GA) Public Library, SPLOST 8 bookmobile project request, budget years 2022–2027; checked Oct 15, 2026) | $ |
| Warranty work and transportCovered repairs under the written warranty; your cost to get the unit to service when a visit is not warranty | HLE keeps a field-service technician on the road with a service trailer that goes to the unit for warranty and repair work. The written warranty makes transportation to and from Elkhart, Indiana or an authorized service center the owner's expense. What a non-warranty field visit costs: Ask HLE. | HLE service and field service; transport clause in the structural body warranty, rev. July 2025 and the vans and conversions warranty, rev. June 2026 | $ |
| InsuranceThe quote from your agent: auto, physical damage, equipment, liability | No published range covers it; the premium depends on the chassis, the value of the body and equipment, and where it runs. | Give your agent the plan sheet and the chassis (section 8). | $ |
| ConsumablesSupplies per visit × visits a year | Median 3,491 visits a year per mobile clinic (middle half: 1,828 to 6,050; 253 clinics reporting). | Annual visits (Malone et al., "Mobile health clinics in the United States," Int. J. for Equity in Health, 2020; checked Oct 15, 2026) | $ |
| Permits, licenses, registrationCity, county and state fees; plates and registration | Set locally; no published range. A county bookmobile carried $1,000 a year for phone and $5,000 for computers alongside it. | Other operating lines (Augusta-Richmond County (GA) Public Library, SPLOST 8 bookmobile project request, budget years 2022–2027; checked Oct 15, 2026) | $ |
| Parking and shore powerRent for the space, if any; electricity at the base | Set locally; no published range. Ask HLE what service the plan's shore power inlet takes before the electrician quotes the outlet (section 6). | Your own quotes. | $ |
| Repair reserveAn amount set aside each year for what breaks | Vehicle and equipment depreciation ran 5% to 25% of annual cost by service type (primary care/preventive 5%, dental 11%, mammography/primary care/preventive 25%): a measure of what the unit and its equipment use up each year. | Depreciation share of cost (Attipoe-Dorcoo et al., "Analysis of Annual Costs of Mobile Clinics in the Southern United States," J. Primary Care & Community Health, 2020, 2018 dollars; checked Oct 15, 2026) | $ |
| Total, year oneThe sum of the lines above | What whole programs report spending a year: Average annual operating cost $550,000 across the Mobile Health Map network; the report says the range runs from thousands to several million a year with the services offered and how often the unit runs. (Mobile Health Map (Harvard Medical School), 2025 Mobile Clinics Landscape Report, posted Jan 2026; checked Oct 15, 2026) Average $632,369 a year (173 clinics): prevention clinics $319,868, primary care $981,092, dental $1,169,559. (Malone et al., "Mobile health clinics in the United States," Int. J. for Equity in Health, 2020; checked Oct 15, 2026) Mean annual cost by service type (15 programs, 2018 dollars): mammography/primary care/preventive $304,890; preventive $479,092; primary care/preventive $821,586; dental $2,257,587; dental/preventive $2,449,655. Cost per patient visit $65 to $243. (Attipoe-Dorcoo et al., "Analysis of Annual Costs of Mobile Clinics in the Southern United States," J. Primary Care & Community Health, 2020, 2018 dollars; checked Oct 15, 2026) A county bookmobile budgeted $126,000 a year to operate. (Augusta-Richmond County (GA) Public Library, SPLOST 8 bookmobile project request, budget years 2022–2027; checked Oct 15, 2026) | $ | |
What it costs to run: Mobile medical clinic
Published whole-program figures: an average of $550,000 a year (Mobile Health Map (Harvard Medical School), 2025 Mobile Clinics Landscape Report, posted Jan 2026; checked Oct 15, 2026); an average of $981,092 a year for primary care clinics and $319,868 for prevention-only clinics, with a median of 3,491 visits a year (Malone et al., "Mobile health clinics in the United States," Int. J. for Equity in Health, 2020; checked Oct 15, 2026); $821,586 a year and $150 a visit for primary care/preventive programs, $479,092 and $243 a visit for preventive programs, with labor 91% to 92% of the total and maintenance 3% to 4% (Attipoe-Dorcoo et al., "Analysis of Annual Costs of Mobile Clinics in the Southern United States," J. Primary Care & Community Health, 2020, 2018 dollars; checked Oct 15, 2026).
The reference reviewers know: The Family Van in Boston cost $567,700 to run in its 2008 year, about $117 a visit, and the authors put its return at $36 for every $1 spent (Oriol et al., "Calculating the return on investment of mobile healthcare," BMC Medicine (The Family Van, Boston), 2009; checked Oct 15, 2026). It is older than the rest; use it for the shape of the argument, not the dollar figure.
What drives the number is staffing and days of operation, not the vehicle. Everything other than labor, maintenance and depreciation included, came to under a tenth of annual cost in the two primary-care categories above.
What it costs to run: Mobile dental unit
Dental units are the most expensive mobile programs to run in both published data sets: an average of $1,169,559 a year (37 dental clinics reporting) (Malone et al., "Mobile health clinics in the United States," Int. J. for Equity in Health, 2020; checked Oct 15, 2026); $2,257,587 a year and $123 a visit for dental programs, $2,449,655 and $225 a visit for dental/preventive programs, with labor 80% to 82%, maintenance 7% and depreciation 11% to 13% of the total (Attipoe-Dorcoo et al., "Analysis of Annual Costs of Mobile Clinics in the Southern United States," J. Primary Care & Community Health, 2020, 2018 dollars; checked Oct 15, 2026).
The per-visit cost is low because a dental unit sees many patients a day; the annual cost is high because it carries clinical staff on every one of those days. Budget the chairs and the compressor as equipment you furnish (section 3), and expect the maintenance line to carry the compressor, vacuum and plumbing a medical unit does not have.
What it costs to run: Bookmobile
Two public budgets, itemized: Augusta-Richmond County planned $126,000 a year: $84,000 for two full-time staff, $7,000 fuel, $7,000 gas (utilities), $10,000 equipment maintenance, $2,000 facility maintenance, $3,500 operating supplies, $3,500 to refresh the collection, $5,000 computers, $3,000 non-capital items and $1,000 phone (Augusta-Richmond County (GA) Public Library, SPLOST 8 bookmobile project request, budget years 2022–2027; checked Oct 15, 2026); Newport News ran its bookmobile for $119,350 in FY2011 (its stated total; the four lines it prints sum to $119,680): $75,585 for two full-time staff, $25,663 benefits, $15,967 vehicle costs and $2,465 other, and the vehicle line (lease, repairs, fuel and insurance premium) ranged from $11,957 to $23,534 a year across FY2006–2011, with fuel $3,413 to $5,038 and repairs $3,703 to $10,831 (City of Newport News (VA) Libraries, FY2012 budget position paper on bookmobile service, April 2011; checked Oct 15, 2026).
The Newport News figures are 2011 dollars; the pattern is what to take from them. Staff are two thirds to four fifths of the budget, the vehicle itself about an eighth, and the repair line is the one that swings from year to year. That is the case for a repair reserve.
11. The countdown: what is due 60, 30 and 14 days out
The same checklist, by date. Count back from the deadline; anything late at 14 days is a reason to talk to the funder or to aim at the next round.
Email alerts start soon. Until then, follow opening and closing dates with the calendar feed (Google, Outlook or Apple Calendar) or the RSS feed.
60 days before
- SAM.gov registration current. Federal rounds and most state pass-through rounds check it, and a renewal can take weeks. Look up the expiration date now. More
- Eligibility confirmed in the notice. The applicant and the vehicle, both answered in the solicitation itself, not the listing. More
- Plan, platform and equipment decided. The floor plan, the chassis or trailer, and who furnishes the equipment. These three set the budget range and the build time. More
- Parking, permits and licensing asked. Where the unit sleeps, shore power at the base, local permits, and whether the state licenses a mobile site. More
30 days before
- Quotes in hand. A budget range for the plan you picked, the equipment itemized, delivery on its own line. More
- Insurance quote. Give your agent the plan sheet and the chassis; the premium goes in the operating-cost worksheet. More
- Letters of support requested. Ask partners at each stop (clinics, schools, the county, the health department) now; letters take two to three weeks. More
- Board resolution scheduled. Find the board meeting before the deadline that can authorize the application and the match, and get it on the agenda. More
- Driver license class checked. The chassis weight rating against your drivers and any weight or CDL limit in the notice. More
14 days before
- Budget narrative written. The vehicle line says what the unit does that a building cannot, inside any capital cap. More
- Attachments ready. Floor plan sheet, spec paragraphs and the budget range, from the proposal kit. More
- Operating cost filled in. The first-year worksheet: fuel, driver, maintenance, insurance, consumables, permits, parking, reserve. More
- Staffing matched to the plan. Driver, setup and a person for every station the plan has. More
12. The three mistakes applications make with the vehicle line
- Over-specifyingWriting every option on the sheet, or one builder's feature list, into the application. It pushes the budget past the cap, and after award the spec is the document the vehicle is bid against. Specify what the program has to do (stations, access, power, storage) and let the plan sheet carry the rest.
- Under-budgeting deliveryLeaving out the trip from the plant. The unit is built in Wakarusa, Indiana; delivery is a line of its own in the budget.
- Missing the equipment lineBudgeting the vehicle and not what goes in it. The MRI, the dental chairs, the security package are often customer-furnished and priced apart from the body. If the application does not carry them, nothing pays for them.
13. What to ask HLE for, and when
| When | What | Back in |
|---|---|---|
| When you find the round | The proposal kit: plan sheet, spec paragraphs, budget range, timeline, vendor packet | Download after a short form |
| Before you write the budget | A budget price for the plan you picked, equipment itemized | A range |
| When the application needs your name on it | A tailored proposal: the kit adjusted to your round, your organization, your timeline | In your name |
| After award, when purchasing writes the solicitation | A bid package: spec language with material grades, compliance statements, references | To your format |
| Only for a qualified project | A custom floor plan: for an eligible applicant with a confirmed deadline and a budget in range | Quoted, by engineering |
Sources: the Grants.gov public API (Oct 7, 2026), the CMS Rural Health Transformation Program state documents and award reports checked Oct 7, 2026, the USDA Community Facilities program page, and the federal CDL and FMCSA rules (49 CFR 383.91, 390.3; states can add their own). Operating-cost figures in section 10 are from the published studies, public budgets and HLE warranty documents linked beside each one, all read Oct 15, 2026; they are references, not HLE quotes. Some state details came from page summaries rather than full solicitations; verify eligibility in each solicitation. HLE does not determine eligibility or write applications. We supply the vehicle and the documents about it.